TECHNICAL SPECIFICATIONS FOR INDUCTION FURNACES ( CASTING UNITS ) |
||||||||||
Sl.No | Description | |||||||||
01 |
Furnace Capacity (Kgs) |
100 |
200 |
500 |
750 |
1000 |
1500 |
2000 |
2500 |
3000 |
02 |
MF Power (KW) |
75 |
150 |
250 |
375 |
500 |
750 |
1000 |
1250 |
1500 |
03 |
Transformer Capacity (KVA) |
95 |
190 |
315 |
470 |
625 |
940 |
1250 |
1565 |
1875 |
04 |
Solid State Power Panel Efficiency |
95% |
97% |
|||||||
05 |
Frequency (Hz) |
3000 |
3000 |
1000 |
1000 |
1000 |
1000 |
500 |
500 |
500 |
06 |
Maximum Mains (KVA) |
85 |
170 |
280 |
415 |
555 |
825 |
1110 |
1385 |
1665 |
07 |
Mains PF (min at rated mains voltage & max power setting) |
0.94 |
0.95 |
|||||||
08 |
Load Matching |
by automatic frequency shifting with constant power tracking |
||||||||
09 |
Steel Melting Rate @ 1675 deg cent for steel scrap 100% yield (Kgs/Hr) |
125 |
265 |
440 |
660 |
875 |
1375 |
1850 |
2300 |
2750 |
10 |
Energy Consumption @ 1675 deg cent for steel scrap 100% yield (KWH/Ton) |
550 |
540 |
|||||||
11 |
DM Water Requirement (Litre) |
250 |
1250 |
500 |
500 |
750 |
750 |
1000 |
||
12 |
Over Head Storage Tank Capacity (Litre) |
7500 |
7500 |
10000 |
10000 |
15000 |
15000 |
22000 |
25000 |
27500 |
13 |
Cooling Tower Duty in LPM for temp drop from 42 deg cent to 32 deg cent |
75 |
140 |
225 |
340 |
450 |
675 |
900 |
1125 |
1350 |
14 |
Underground Storage Tank Capacity (Litre) |
25000 |
25000 |
30000 |
30000 |
45000 |
45000 |
60000 |
75000 |
75000 |