TECHNICAL SPECIFICATIONS FOR INDUCTION FURNACES ( CASTING UNITS ) |
Sl.No |
Description |
|
|
|
|
|
|
|
|
|
01 |
Furnace Capacity (Kgs) |
100 |
200 |
500 |
750 |
1000 |
1500 |
2000 |
2500 |
3000 |
02 |
MF Power (KW) |
75 |
150 |
250 |
375 |
500 |
750 |
1000 |
1250 |
1500 |
03 |
Transformer Capacity (KVA) |
95 |
190 |
315 |
470 |
625 |
940 |
1250 |
1565 |
1875 |
04 |
Solid State Power Panel Efficiency |
95% |
97% |
05 |
Frequency (Hz) |
3000 |
3000 |
1000 |
1000 |
1000 |
1000 |
500 |
500 |
500 |
06 |
Maximum Mains (KVA) |
85 |
170 |
280 |
415 |
555 |
825 |
1110 |
1385 |
1665 |
07 |
Mains PF (min at rated mains voltage & max power setting) |
0.94 |
0.95 |
08 |
Load Matching |
by automatic frequency shifting with constant power tracking |
09 |
Steel Melting Rate @ 1675 deg cent for steel scrap 100% yield (Kgs/Hr) |
125 |
265 |
440 |
660 |
875 |
1375 |
1850 |
2300 |
2750 |
10 |
Energy Consumption @ 1675 deg cent for steel scrap 100% yield (KWH/Ton) |
550 |
540 |
11 |
DM Water Requirement (Litre) |
250 |
1250 |
500 |
500 |
750 |
750 |
1000 |
12 |
Over Head Storage Tank Capacity (Litre) |
7500 |
7500 |
10000 |
10000 |
15000 |
15000 |
22000 |
25000 |
27500 |
13 |
Cooling Tower Duty in LPM for temp drop from 42 deg cent to 32 deg cent |
75 |
140 |
225 |
340 |
450 |
675 |
900 |
1125 |
1350 |
14 |
Underground Storage Tank Capacity (Litre) |
25000 |
25000 |
30000 |
30000 |
45000 |
45000 |
60000 |
75000 |
75000 |
Technical Specifications for INDUCTION FURNACES ( INGOT / BILLET UNITS ) |
Description |
01. Furnace Capacity (Kgs) |
3500 |
4000 |
5000 |
6000 |
7000 |
8000 |
10000 |
12000 |
15000 |
18000 |
20000 |
22000 |
25000 |
02. MF Power (KW) |
1750 |
2000 |
2250 |
2500 |
3000 |
3500 |
4000 |
5000 |
6000 |
7000 |
7500 |
8000 |
8500 |
03. Transformer Capacity (KVA) |
2190 |
2500 |
2825 |
3125 |
3750 |
4500 |
5000 |
6250 |
7500 |
8750 |
9500 |
10000 |
10500 |
04. Solid State Power Panel Efficiency |
97% |
05. Frequency (Hz) |
500 |
06. Maximum Mains (KVA) |
1940 |
2215 |
2440 |
2710 |
3255 |
3880 |
4340 |
5425 |
6510 |
7600 |
8310 |
8865 |
9420 |
07. Mains PF (min at rated mains voltage & max power setting) |
Better than 0.95 |
08. Load Matching |
By automatic frequency shifting with constant power tracking |
09. Steel Melting Rate @ 1675 deg cent for steel scrap 100% yield (Kgs/Hr) |
3200 |
3600 |
4050 |
4500 |
5400 |
6300 |
7000 |
8800 |
10500 |
12200 |
13200 |
14000 |
15000 |
10. Energy Consumption @ 1675 deg cent for steel scrap 100% yield (KWH/Ton) |
540 |
540 |
530 |
11. DM Water Requirement (Litre) |
1000 |
1000 |
1250 |
1250 |
1500 |
1500 |
1500 |
1500 |
2000 |
2000 |
2500 |
2500 |
2500 |
12. Over Head Storage Tank Capacity (Litre) |
30000 |
32000 |
35000 |
35000 |
35000 |
50000 |
50000 |
50000 |
50000 |
60000 |
60000 |
80000 |
80000 |
13. Cooling Tower Duty in LPM for temp drop from 42 deg cent to 32 deg cent |
1575 |
1800 |
2000 |
2250 |
2700 |
3200 |
3600 |
4500 |
5400 |
5300 |
6750 |
7200 |
7650 |
14. Underground Storage Tank Capacity (Litre) |
90000 |
100000 |
100000 |
100000 |
100000 |
150000 |
150000 |
150000 |
150000 |
200000 |
200000 |
250000 |
250000 |